Pipe Support Details

Nominal Pipes Diameter

Hanger rod diameter

Hanging Strip Size(thickxwidh)

Spacing between supports

25 mm

8 mm

20 x 1 mm

2 Meter

32 mm

8 mm

20 x 1 mm

2.5 Meter

40 mm

8 mm

20 x 1 mm

2.5 Meter

50 mm

10 mm

25 x 1.2 mm

2.5 Meter

65 mm

10 mm

25 x 1.2 mm

2.5 Meter

80 mm

10 mm

25 x 1.2 mm

2.5 Meter

100 mm*

12 mm

25 x 1.6 mm

2.5 Meter

125 mm*

12 mm

25 x 2 mm

3 Meter

150 mm*

12 mm

25 x 2 mm

3 Meter

* As per Site Requirement Fabrication Support may be used.

Sprinkler Qty

Pipe Size

Min.Sprinkler Qty

Max.Sprinkler Qty

25 mm

1

2

32 mm

3

4

40 mm

5

7

50 mm

8

15

65 mm

16

30

80 mm

31

60

100 mm*

61

100

150 mm*

More than 100

Supporting Chanel & U Bolt

Pipe Size

Chanel

U Bolt Dia

Up to 50 mm

38x38xx6 mm

9 mm

65 To 100 mm

75x75x6 mm

12 mm

125 To 200 mm

88x88x9 mm

15 mm

 

Flange  Details

Pipe Dia

Flange Thickness

No. of holes

200 mm.

24 mm.

12

150 mm and 125 mm

22 mm.

8

100 mm and 80 mm

20 mm.

8

65 mm.

18mm

4

40 mm and below.

16mm

4

Pipe Support Details

MS Angle(mm)

Anchor Faster

Width

40X40X5

12MM

200MM both Side of Pipe

Holiday Test Voltage (IS 15337)

Thickness of Coating

Test Voltage, Max

2 mm

10KV

3 mm

12KV

4 mm

15KV

Recommended Welding Electrode Size

Average Thickness of Plate or Sections

Maximum Electrode Size

Current Range

1.5 To 2.0 mm

2.5 mm

60 To 95 Amp

2.0 To 5.0 mm

3.2 mm

110 To 130 Amp

5.0 To 8.0 mm

4.0 mm

140 To 165 Amp

>8.0 mm

5.0 mm

170 To 260 Amp

About Jignesh.Parmar (B.E,Mtech,MIE,FIE,CEng)
Jignesh Parmar has completed M.Tech (Power System Control), B.E(Electrical). He is member of Institution of Engineers (MIE) and CEng,India. Membership No:M-1473586.He has more than 16 years experience in Transmission -Distribution-Electrical Energy theft detection-Electrical Maintenance-Electrical Projects (Planning-Designing-Technical Review-coordination -Execution). He is Presently associate with one of the leading business group as a Deputy Manager at Ahmedabad,India. He has published numbers of Technical Articles in “Electrical Mirror”, “Electrical India”, “Lighting India”,”Smart Energy”, “Industrial Electrix”(Australian Power Publications) Magazines. He is Freelancer Programmer of Advance Excel and design useful Excel base Electrical Programs as per IS, NEC, IEC,IEEE codes. He is Technical Blogger and Familiar with English, Hindi, Gujarati, French languages. He wants to Share his experience & Knowledge and help technical enthusiasts to find suitable solutions and updating themselves on various Engineering Topics.

2 Responses to Quick Reference-Fire Fighting (Part-3)

  1. Sumesh V says:

    Sir,
    I am a regular reader of your articles. It is too informative.

    The recommended phase to phase and phase to ground clearance on 11kV DP structure is 915mm and 610mm respectively. Please be kind enough to inform, from where (standard or rule) this value is derived.

  2. Shrikanth Kannan says:

    Good morning, Please clarify how to calculate the main power source of the connected load is about 3000 kW

    What should be the main power source capacity and other factors to be considered

    Thanks Best regards Srikanth

    On Sun, 15 Aug, 2021, 9:14 am Electrical Notes & Articles, wrote:

    > Jignesh.Parmar (B.E,Mtech,MIE,FIE,CEng) posted: ” Pipe Support Details > Nominal Pipes Diameter Hanger rod diameter Hanging Strip Size(thickxwidh) > Spacing between supports 25 mm 8 mm 20 x 1 mm 2 Meter 32 mm 8 mm 20 x 1 mm > 2.5 Meter 40 mm 8 mm 20 x 1 mm 2.5 Me” >

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: