Method for Installation of HVAC System (Part-3)

(C) Y Joints

  • Confirm the Y branching piping matches allowable designs from the Installation Manual

  •  Installed with single end of Y Joints always towards outdoor unit.
  • The branch joint of outdoor side must be installed horizontally.
  • The branch joint of indoor side can be installed horizontally or vertically.
  • Y Joints are supported before and after.
  • “Y” joints are the correct size and match the locations as shown on the Selection Report.
  • Maintain a minimum distance of 20″ between branching joints, headers, elbows and equipment.
  • Recommend horizontal runs to be 3 times that of the vertical when traps cannot be avoided

  • Between two branch joints ≥1m
  • Between branch joints and indoor unit ≥0.5m
  • From the inlet or outlet of branch joint, there should be straight pipe with length at least 0.5m

(D) Copper Pipe Length:

The permitted length and drop difference

Pipe length Max. pipe length <= 240 Meter
Equivalent length from the first branch to the farthest indoor unit <= 40 Meter
Drop height Drop height between indoor unit and outdoor unit <= 110 Meter
Drop height between indoor units <= 30 Meter

  • Record the actual liquid pipe length for future reference when charging additional refrigerant.

Split AC Copper Pipe Length

A.C Capacity Maximum Pipe Length Maximum Indoor & Outdoor Height Difference
0.5 Ton 15 Meter 5 Meter
0.6 Ton 15 Meter 5 Meter
0.75 Ton 15 Meter 5 Meter
1 Ton 20 Meter 10 Meter
1.5 Ton 25 Meter 10 Meter
2 Ton 25 Meter 10 Meter
2.5 Ton 30 Meter 10 Meter
3 Ton 30 Meter 20 Meter
3.5 Ton 30 Meter 20 Meter
4 Ton 30 Meter 20 Meter

(E) Drain Pipe

  • Water leakage test
  • Check leakage of water pipe After finished installation of drainage pipe, filled the pipe with water,
  • Waiting for 24 hours to check whether there’s any leakage.
  • Check leakage from the indoor unit
  • Charge water from the check hole of indoor unit to check whether the water can be exhausted smoothly or not

Size of Drain Pipe

Condensate water volume : V (L/h)=Indoor Unit (HP)x2  I.D (mm)  Thickness (mm)
V ≤ 14 Φ 25 3
14 V ≤ 88 Φ 30 3.5
88 V ≤ 175 Φ 40 4
175 V ≤ 334 Φ 50 4.5
334 V Φ 80 6
*If Slop is <1% than select next higher Size of Drain Pipe

(F) Insulation of Refrigerant Pipe & Drain Pipe

  • The slip-on method of installation is used for insulation on new refrigeration piping
  • The inside of the insulation is coated with a powdered lubricant, making it easy to slip the insulation over the pipe.
  • Small amounts of powdered lubricant may enter the open ends of pipe or tubing. This dust must be kept out of refrigeration systems. Plug the open ends of pipe before slipping on the insulation.
  • Apply insulation only when the pipes are clean, dry, and unheated or uncooled. The surface to be insulated must be free of rust.
  • Never stretch insulation when sealing the joints. It is better to compress it slightly. Use pieces of insulation that are at least as long as the section of pipe to be insulated.
  • Always use the insulation that is properly sized for the pipe it is to cover. Do not stretch it over the pipe.
  • Do not crowd insulation-covered pipes. Space pipes far enough apart to allow for the free circulation of air. Air movement is an extra safeguard against surface condensation of cold pipes, especially under hot, humid conditions.

  • All piping insulation must be properly sealed to minimize heat loss and control condensation. On cold lines, open pipe insulation joints may allow the formation of condensation, increasing the potential for or contributing to possible pipe or tubing corrosion. Seal insulation joints
  • Do not compress piping insulation at joists, studs, columns, ducts, hangers, etc. This is important because the insulation will lose thermal efficiency where it is compressed. On cold systems, surface condensation may occur where insulation is compressed
  • Apply a coating of an approved contact-type adhesive to both butt ends to be joined.

  • Before butting the ends together, allow the adhesive to set until it is dry to the touch but still tacky under slight pressure. Join the surfaces.
  • Cut open the inside wall of the elbow, taking care not to damage the opposite wall. The slit-open elbow should slip over the fitting. Apply adhesive to the seam (not to the butt ends), allow to tack dry, and fit over the fitting. Press the seams together working from the ends toward the center of the elbow.

  • Finally, wet seal the butt ends to the incoming lengths of insulation. Cut the incoming lengths so that the butt joints are in slight compression.

  • Do not wrap the gas and liquid refrigerant pipes together.
  • Avoid compressing the insulation as much as possible
  • Be sure there are no cracks or deformities in the insulation at bends in pipes.
  • If necessary double the insulation to prevent condensation from forming in warm or humid areas.
  • Cut off excess insulation.

 Referent Pipe Insulation

Pipe Pipe size Insulation Type (EPDM or NBR)

 

Standard conditions 86°F (30°C), < 85% High humidity conditions(a)
86°F (30°C), >85%
Liquid Pipe 1/4″ (6.35 mm)  To 3/8″ (9.52 mm) 3/8″ (9 mm) 3/8″ (9 mm)
1/2″ (12.70 mm)  To  2″ (50.80 mm) 1/2″ (13 mm) 1/2″ (13 mm)
Vapor Pipe 1/4″ (6.35 mm) To 7/8″ (22.23)  1/2″ (13 mm) 3/4″ (19 mm)
  • Wrap insulation around the entire surface of each pipe, including the refrigerant pipes from the indoor unit to the service valves inside the outdoor unit, the branch joints, distribution header, and connection points on each pipe.

  • Do not wrap the vapor and liquid refrigerant pipes together.
  • If vapor and liquid pipes are in contact with one another, use thicker insulation and make sure the pipes are not pressing tightly against one another.
  • Pipe connections between the indoor unit and EEV kit: Leave 3/8 in. (10 mm) of space between vapor and liquid pipes.
  • Be sure there are no cracks or deformities in the insulation at bends in pipes or where hangers are attached to pipes.
  • If necessary, double the insulation to prevent condensation from forming in warm or humid areas.

Insulation Thickness

Refrigerant Pipe Insulation Drain Pipe Insulation
22.22mm To 28.58mm 19mm 25mm / 32mm /40mm 6mm
12.7mm To 19.05mm 13mm / 19mm
6.35mm To 9.2mm 9mm / 13mm

About Jignesh.Parmar (B.E,Mtech,MIE,FIE,CEng)
Jignesh Parmar has completed M.Tech (Power System Control), B.E(Electrical). He is member of Institution of Engineers (MIE) and CEng,India. Membership No:M-1473586.He has more than 16 years experience in Transmission -Distribution-Electrical Energy theft detection-Electrical Maintenance-Electrical Projects (Planning-Designing-Technical Review-coordination -Execution). He is Presently associate with one of the leading business group as a Deputy Manager at Ahmedabad,India. He has published numbers of Technical Articles in “Electrical Mirror”, “Electrical India”, “Lighting India”,”Smart Energy”, “Industrial Electrix”(Australian Power Publications) Magazines. He is Freelancer Programmer of Advance Excel and design useful Excel base Electrical Programs as per IS, NEC, IEC,IEEE codes. He is Technical Blogger and Familiar with English, Hindi, Gujarati, French languages. He wants to Share his experience & Knowledge and help technical enthusiasts to find suitable solutions and updating themselves on various Engineering Topics.

3 Responses to Method for Installation of HVAC System (Part-3)

  1. srinivas says:

    Hi , can you include air balancing methodology in HVAC System

  2. Dakshinamoorthy says:

    Sir I want Indian house wiring notes with examples

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

<span>%d</span> bloggers like this: